Construction Site Accident Lawyers
Construction Site Accident Attorneys

Dedicated to preventing construction site accidents, scaffolding accidents, crane injuries, explosion accidents, chemical injuries and mesothelioma deaths through accountability.

Construction Site Accident Personal Injury Lawyers
Construction Site Accident Personal Injury Attorneys
Construction Site Accident Personal Injury Lawyers Providing Litigation for Construction Site Accident Claims
Arial Lifts
Box Truck Accidents
Chemical Accidents
Chemical Hazards
Company Car & Truck Accidents
Construction Accidents
Construction Fall Deaths
Construction Site Deaths By State
Crane Accidents
Crane Operator Electrocutions
Derrick Accidents
Drill Rigs
Dump Truck Accidents
Electrocution Injuries
Elevator Accidents
Escalator Accidents
Explosions
Flat Bed Accidents
Forklift accidents
Front End Loaders
Gas Explosions
Hoist Accidents
Industrial Accidents
Ladder Accidents
Lumber Truck Accidents
Malignant Pleural Mesothelioma
Methane Gas Explosion
Pipe Accidents
Product Liability
Rolloff Truck
Scaffolding Accidents
Skid Steer Loaders
Tractor Accidents
Truck Accidents
Welding Accidents


Free Consultation from a Construction Site Accident Lawyer

DATE: November 4, 1993
MN FACE Investigation 93MN01001

Electrician Dies from Electrocution

SUMMARY

A 42-year-old male journeyman electrician (victim) was fatally injured when he made direct contact with a bare section of an energized 240V electrical conductor in the base of a street light pole. He was not using any electrical personal protective equipment at the time of the incident. He was part of a two-person crew replacing lamp heads on the poles. The victim, working at the base of poles, would remove a fuse to disconnect power to the lamp head, prepare and splice together wires to bypass a ballast located in the base, and reinsert the fuse when work by the other crew member, at the lamp head, was complete. Electrical power from feeder boxes to the base of poles was not shut down during the replacement process so that new lamp heads could be checked for operation immediately after installation. At the time of the incident, work had proceeded to the point where the fuse had been removed and the ballast had been removed from the base of a pole. The victim reached inside the pole to retrieve the now deenergized wire that went to the lamp head to prepare it for splicing. He inadvertently contacted the 240V lead conductor from the feeder box, on the energized side of the fuse, and was electrocuted. Inspection of this conductor showed that approximately two inches of insulation had been gnawed away by rodents. MN FACE investigators concluded that, in order to prevent similar occurrences, the following guidelines should be followed:


perform electrical work with electrical power off, if possible;

install barriers made of fiberglass or other non-conductive materials where maintenance may be required at fuses which would separate energized and deenergized conductors during such maintenance;

wear protective electrical work gloves at all times during work around energized electrical conductors; and

thoroughly examine and ensure the integrity of conductor insulation prior to work near them.
 

INTRODUCTION

MN FACE was notified of an August 24, 1993, work-related electrocution within hours of the incident. The MN FACE investigation began the next day. MN OSHA and the county coroner's office were contacted and releasable information was taken. A police report of the incident was requested and received. An employer interview with the company safety director was conducted on September 10, 1993. A site investigation was not conducted because work crews were no longer on site, but photos and the incident pole's ballast and electrical conductors were made available to the MN FACE investigator for inspection during the employer interview.

The victim, a foreman of a two-person work crew, worked for an electrical construction company contracted by a state agency to replace existing mercury vapor lamp heads with high pressure sodium lamp heads on city street light poles. A two-person day crew and a two-person night crew had been working on the 1800-pole job for about six weeks prior to the incident. About 400-450 lamp heads had been replaced.

The 50-year-old company employed an average of 100-125 electricians, depending on job availability. The victim, a journeyman electrician for 20 years, was employed continuously for the last 3.5 years performing almost entirely street work.

 

INVESTIGATION

The victim was the foreman of the two-person day crew. They were changing lamp heads on metal, 50-foot tall, single lamp, street light poles along a busy city roadway. Hazards associated with heavy traffic along the work site was a major concern. Cones and directional traffic signs for barricading workers were in place and the workers were wearing full reflective suits on site. It was hot and humid with dew on the grass late into the morning; there had been recent rains in the area as well. High voltage and leather work gloves were on site but not in use at the time of the incident. A state line inspector, in a vehicle about 100 yards ahead of the incident pole, was also on site. The incident occurred at 11:00 am.

Ballasts for the existing mercury vapor lamp heads were located at the base of each pole. Ballasts for the new, replacement sodium lamp heads were in the heads themselves. The job for each pole, therefore, consisted of replacing the lamp head and, at the same time, by-passing the existing ballast by splicing together the wires leading to the pole from the feeder box with those leading up the pole to the new head. The victim, working at the base of the pole, would disconnect a fuse on the line-side of the ballast to kill power in the pole to the lamp head, disconnect the ballast, and prepare wires for splicing at that location. The other crew member, at the top of the pole in an aerial bucket, would disconnect the old head and install the new one. After splicing and reinsertion of the fuse, the work would be complete. Power from feeder boxes typically lighted 10-100 poles and was not shut off during the procedure so that new lamp heads could be checked for operation immediately after installation. The lead wire entering the base of the incident pole from the feeder box was 240V.

Before the incident, the victim had proceeded with the base work to the point where the fuse had been disconnected, the ballast had been removed from the base of the pole, and the black wire from the ballast to the fuse had been cut and trimmed in preparation for the splice. The next step would have been to cut the wire from the lamp and splice it to the black wire with the fuse retainer. Evidence suggests that as the victim reached for the wire that went to the lamp he contacted a bare section of the 240V lead wire on the energized side of the fuse and was electrocuted.

Inspection of this conductor showed that about two inches of the insulation on it had been damaged, presumably from rodents gnawing on it. Nesting materials, fur, and debris were observed inside the pole's base; some had been partially dragged out of the base when the ballast was removed. Insulation on the pole's neutral white wire was similarly damaged. Nesting materials and snakes had been found in other poles by workers, but damaged insulation had never before been encountered. Animals apparently gained access into poles by crawling between the bottom of the poles and the concrete in a drainage groove in the concrete.

The victim's coworker heard him moan and, after descending in the bucket, found the victim lying unconscious on his back between the pole and a chain link fence behind it, with the pole at his waist. A wire was lying on the victim's leg and, not knowing whether it was energized or not, the coworker used a wooden outrigger landing pad to remove it from him. He pulled the victim four to six feet from the pole, called 911 from a mobile phone, and began CPR. Because he was somewhat confused as to whether the 911 call had been dispatched, the coworker stopped CPR momentarily to flag down a passing motorist, who solicited help from a police station about 300 yards away. The line inspector, who was parked ahead of the workers, did not realize the incident had occurred until police arrived at the site five minutes later. The coworker continued CPR until he was relieved by other first responders. The victim could not be resuscitated and was pronounced dead at the hospital emergency room. Burns were found on the victim's right thumb, middle, and ring fingers; no exit wounds were observed.

 

CAUSE OF DEATH

The cause of death reported by the county coroner's office was electrocution.

 

RECOMMENDATIONS/DISCUSSION

Recommendation #1: Perform electrical work with electrical power off, if possible.

Discussion: A two-person day crew and two-person night crew were replacing lamp heads for this project. Leaving power on to the street lights allowed immediate assessment and repair of new replacement heads which were not functional after installation. It was also considered necessary for street lights to remain on at night for both worker and road traffic safety. Power to the street lights could have been disconnected during the day when lights for traffic were not necessary. After head replacement on all poles was complete, power could be reconnected to determine which heads, if any, required repair. A work procedure such as this, even though is may require more time, may be warranted when conductor condition inside poles is unknown.

 

Recommendation #2: Install barriers made of fiberglass or other nonconductive materials where maintenance may be required at fuses which would separate energized and deenergized conductors during such maintenance. This recommendation is in accordance with 29 CFR 1926.403(i)(2)(i).

Discussion: When poles are initially installed, barriers to separate energized and deenergized conductors at fuses which are likely to require later maintenance could be put in place. If it is necessary to work near the conductors with electrical power on, then the barrier would provide protection for the worker.

 

Recommendation #3: Wear protective electrical work gloves at all times during work around energized electrical conductors.

Discussion: High voltage and leather work gloves were at the incident site, but were not being used by the victim. It is sometimes difficult for workers to perform fine, manipulative electrical work with heavy gloves on, but when conductors are exposed to damaging environments and/or cannot readily be seen by workers, gloves should be worn at all times to ensure worker protection. Supple leather work gloves that provide protection up to 750V are available. According to the safety director, the company intends to provide all workers with this type of glove for use during work near energized conductors.

 

Recommendation #4: Thoroughly examine and ensure the integrity of conductor insulation prior to work near them. This recommendation is in accordance with 29 CFR 1926.403(b)(1).

Discussion: When it is absolutely necessary to work near energized conductors, examination of conductor insulation is essential to ensure worker safety. This practice could be especially important when conductors exist under damaging environmental conditions. If damage to the insulation is observed, proper protective equipment (gloves) and/or measures (disconnect power) should be used to prevent injury to workers.

 

REFERENCES

1. Office of the Federal Register, Code of Federal Regulations, Labor, 29 CFR Part 1926.403(b)(1) and 1926.403(i)(2), U.S. Department of Labor, Occupational Safety and Health Administration, Washington, D.C., July 1, 1992.

 

To contact Minnesota State FACE program personnel regarding State-based FACE reports, please use information listed on the Contact Sheet on the NIOSH FACE web site Please contact In-house FACE program personnel regarding In-house FACE reports and to gain assistance when State-FACE program personnel cannot be reached.


Free Consultation

Title:
First Name: *
Middle Name:
Last Name: *
Home Phone: *
Cell Phone:
Work Phone:
Email Address:
Address: *
City: *
State, Zip: *    *

What is the best way to reach you?
Please provide the best place, time and
method for contacting you.


Injured Person Information:

Date of Birth / Age:
(ex. mm/dd/yyyy or 54)
Were you injured? Yes    No
If not, who are you 
inquiring on behalf of?
If you are NOT inquiring on your own behalf,
what is your relationship to the injured person?
Is the person deceased? Yes    No
If deceased, what is the cause of death
as stated on the death certificate:
Date of Death:
(ex. mm/dd/yyyy)
Was an autopsy performed? Yes    No
If not deceased, does the 
injury prevent you or the 
victim from working?
Yes    No
If yes, when did you/victim stop working?
What is the approximate lost wages
due to the injury?


Accident / Injury Information:

Date of Accident:   *
City where accident occured: *
State where accident occured: *
Occupation:
Name and Address of employer:
Describe Construction Site related injury:


Case Description*
Please explain exactly what happened, trying to state
as thoroughly as possible who you believe was responsible
and why you believe that person was negligent:
Please explain the full extent of the victims injuries:
Comments / Additional Information
Is there anything else that would assist us in
understanding the facts of your case?


To Better Serve You:

Please tell us how you found us? If "other" please specify.
Please specify how you found us (if other than above):
If you found us using a search engine,
please tell us which search engine?
Please tell us exactly what terms you typed into the
search engine to find us? (i.e. Personal Injury Lawyers)

I understand that by filling out this free consultation form I am not forming an attorney client relationship. I understand that I may only retain an attorney by entering into a fee agreement and that by submitting this form I am not entering into a fee agreement. I understand that not all submissions may receive a response.
Yes   No
I agree that the above does not constitute a request for legal advice. I agree that any information that I will receive in response to the above question is general information and I will not be charged for the response to this e-mail question. I further understand that the law for each state may vary, and therefore, I will not rely upon this information as legal advice. I agree that if this matter requires advice regarding my home state, local counsel may be contacted for referral of this matter. I understand that email is not secure and thus I am not forming a confidential relationship.
Yes   No
I have read and agree with the TERMS AND CONDITIONS
Yes   No

By Clicking the box below, I agree to submit my case for a free case evaluation:



* = Required Fields
Home Page
Free Consultation
Broken Bone Fractures
Chemical Burns
Construction Injuries
Enclosed Space Injuries
Fire Injuries
Mesothelioma
Welding Injuries
Silicosis
Mining Injuries
OSHA Fatal Facts Index
OSHA Office of Training and Education
OSHA Mobile Crane Inspection Guidelines

Free Consultation from a Construction Site Accident Attorney

If you would like to receive information regarding potential new lawsuits, class actions, lawsuit settlements and large verdicts, please enter your name and email address below, and press "submit".








Copyright © 2003 Construction Site Accident .com
A division of Counselseek, Inc. All rights reserved.
[ Home ]   [ Legal Disclaimer ]
Boston Web Site Design